worm gear unit

worm gear unit

Category: Tag:

Worm gear units are favoured in general machinery and plant engineering. HZPT places particular importance on the quality of materials used and thus ensures a:

Long service life

Above average loadability

High performance potential

Excellent smooth and emergency running characteristics

Minimal maintenance

Housing parts: high quality grey cast iron (EN-GJL-200)

Hollow bosses (from gear unit sizes greater than 100): spheroidal graphite iron (EN-GJS-400-15)

Worm shafts: made from 16MnCrS5BG (hardened and ground)

Worm gear unit rims: centrifugally cast solid bronze (with nickel additives GzCuSn12Ni) with outstanding smooth and emergency running properties.

Product Quick Detail:

  • Standard and non-standard available
  • With high quality and competitive price
  • Prompt delivery
  • Packing as per customer’s demand.

We promise will offer the best price by the high quality in china! We also accept special order about the products. If you are interested in our products. Please do not hesitate to let us know.We are pleased to give you the detailed information.We promise that our products would be safety and were in high quality and reasonable price. If you are interested in our products, please contact us asap.We are sincerely looking for your cooperation.

Most of our products are exported to Europe or Americas, both standard and nonstandard products available. We can produce as per your drawing or sample. Material can be standard or as per your special request. If you choose us, you choose reliable.

pruduct quality report

Materials Available

1. Stainless Steel: SS201, SS303, SS304, SS316, SS416, SS420
2. Steel:C45(K1045), C46(K1046),C20
3. Brass:C36000 ( C26800), C37700 ( HPb59), C38500( HPb58), C27200(CuZn37), C28000(CuZn40)
4. Bronze: C51000, C52100, C54400, etc
5. Iron: 1213, 12L14,1215
6. Aluminum: Al6061, Al6063
7.OEM according to your request
product materials available

Surface Treatment

Annealing, natural canonization, heat treatment, polishing, nickel plating, chrome plating, zinc plating,yellow passivization, gold passivization, satin, Black surface painted etc.

Processing Method

CNC machining, punch,turning, milling, drilling, grinding, broaching, welding and assembly
product finishing

QC & Certificate

Technicians self-check in production,final-check before package by professional Quality inspector
ISO9001:2008 , ISO14001:2001,ISO/TS 16949:2009

Package & Lead Time

Size: Drawings
Wooden Case/Container and pallet, or as per customized specifications.
15-25days samples. 30-45days offcial order
Port: Shanghai/Ningbo port
product packages

en_USEN